Administration block

Administration block (2012-13)

Admin block (2012-13)

Construction of the school administration block took place during the last half of 2012 and into 2013. The design of this building was the most complex structure built to date and includes a reception and visitor area, staffroom, principal’s office, bursar’s office, as well as a sick room.